DESIGN AND CONSTRUCTION OF VERTICAL AXIS WIND TURBINE
Keywords:
maintenance, emphasizes, shadingAbstract
The principle objective of this project is Rural Electrification via hybrid system which includes wind
and solar energy. Our intention is to design a wind turbine compact enough to be installed on roof
tops. So we decided to design a vertical axis wind turbine (VAWT) over Horizontal Axis Wind
Turbine (HAWT). Advantages of VAWT over HAWT are compact for same electricity generation,
less noise, easy for installation and maintenance and reacts to wind from all directions.
The wind turbine designed to generate electricity sufficient enough for a domestic use. The electricity
generated will be stored in the battery and then given to the load. This project emphasizes on
electrification of remote areas with minimum cost where load shading still has to be done to meet with
demand of urban areas.